Salford Quays lift bridge
The Salford Quays lift bridge (also known as Salford Quays Millennium footbridge) is a 95-metre long vertical lift bridge bridge spanning the Manchester Ship Canal, in Greater Manchester, England. The bridge, which was completed in 2000, is located near the terminus of the canal at the old Manchester Docks. It links Salford Quays to Trafford Wharfside and has a lift of 18 metres, allowing large watercraft to pass beneath it. The bridge features prominently on the backdrop for the BBC North West Tonight television news programme, which also shows The Lowry and MediaCityUK.

Design
Designed by Carlos Fernandez Casado, the bridge has a main span of 95m in a Lohse Arch , with the two peaks of the twin arches connected at the crown. These brace one another, resulting in greater structural rigidity. The deck is connected to the arches with vertical members, which splay outwards at an increasing angle towards the centre of the span. The sweeping arches are decorated with blue LED lighting, while the deck is illuminated with white downlighting. Pedestrians are protected from the prevailing winds by glass sides, coloured blue at foot level and tapering in, following the angle of the arches. The lifting design utilises four white tubular steel space truss towers with concrete counterweights mounted internally on red carriers, although early plans envisioned spherical counterweights. These are suspended by cable over large grey wheels, mounted above decorative triangular maintenance platforms. This counterbalancing system allows the bridge to complete a raising or lowering through its 18m lift in less than three minutes. The outermost truss sections of each tower curve away from the main bridge at the base, tapering to a point, and each tower is topped with two decorative blue lights. The four towers also feature uplighting from the maintenance platform, although this feature has not been operational for some time. Although not commonly known, the bridge has a 'sister' by the same designer, located in Plentzia, north of Bilbao, Spain. While slightly larger than its Salford Quays counterpart, spanning 108m over the Plentzia river, it does not lift and consequently has no towers.

Construction
The bridge was built by Christiani & Nielsen as the general contractor, who coordinated a 'float-in' installation of the operable span with freight transport specialist Econofreight. The movable span was winched into place between the four support towers from a barge. The approximate cost was USA $7.5 million at the time of construction. The deck is an orthotropic design, which is structurally more efficient than a concrete deck on top of steel deck beams. Orthotropic steel deck systems have begun to dominate movable spans in Europe because smaller towers and lifting mechanisms are required, using less energy to move them. Similar systems are used for welded steel ships and canal lock doors. The lifting system itself was designed and installed by Bennett Associates, also responsible for the tilting mechanism on the Gateshead Millennium Bridge. The system normally operates from the electrical grid, although it has a diesel backup system in case of a power failure.

Operation
The control tower is located on the Salford Quays side of the ship canal, from where the pedestrian barriers and lifting mechanism are operated. Except for Royal Navy visits and dredging, most vessels entering the Salford Quays turning circle are pleasure craft, and as a consequence lifts are most commonly seen between April and October, when Mersey Ferries operate the popular Manchester Ship Canal Cruise service from Liverpool to Salford Quays.