Ryugyong Hotel

The Ryugyong Hotel is a 105- floor supertall skyscraper under construction in Pyongyang, North Korea. Its name comes from one of the historic names for the city of Pyongyang, and means "capital of willows"; the building is also known as the 105 building, a reference to its number of floors. Construction began in 1987, but was halted in 1992 due to the economic disruptions that afflicted the country, and a lack of quality concrete. The hotel stood topped out but without windows or interior fittings for the next sixteen years, until construction resumed in April 2008, under the supervision of the Orascom Group of Egypt, which has invested heavily in the North Korean mobile telephony and construction industries. The hotel rises to a height of 330 metres (1,080 ft), and it contains 360,000 square metres (3,900,000 sq ft) of floor space, making it the most prominent feature of the city's skyline and by far the largest structure in North Korea. Construction of the Ryugyong was intended to be completed in time for the World Festival of Youth and Students in June 1989; had this been achieved, it would have become the world's tallest hotel. The unfinished structure was not surpassed in height by another hotel until the completion of construction on the Rose Tower in Dubai, UAE in 2009. The Ryugyong is currently the world's 30th tallest building, a title it shares with the China World Trade Center Tower III.

A North Korean government official told the Los Angeles Times in 2008 that construction was not completed "because North Korea ran out of money". A decade after the start of construction, the European Union Chamber of Commerce in Korea conducted an inspection of the building, where it was concluded that the structure was " irreparable". International media reaction After construction came to a halt in 1992, the unfinished building sat vacant and without windows, fixtures, or fittings, appearing as a massive concrete shell. A rusting construction crane at the top, which the BBC called "a reminder of the totalitarian state's thwarted ambition", became a permanent fixture. Even though the Ryugyong dominates the Pyongyang skyline, official information regarding the hotel and its status have proven difficult to obtain. Though mocked-up images of the completed hotel had once appeared on North Korean stamps, the government denied the building's existence for many years, manipulated official photographs in order to remove the structure, and excluding it from printed maps of Pyongyang. Former CNN international correspondent Mike Chinoy likened the policy to the matter of a calcium deposit on the neck of longtime dictator Kim Il-sung, which was "never photographed... something you couldn't mention." The alleged problems associated with the hotel led some media sources to dub it "The Worst Building in the World", "Hotel of Doom" and "Phantom Hotel". Construction resumed In April 2008, after 16 years of inactivity, foreign visitors to Pyongyang reported that Egypt's Orascom Group had started refurbishing the hotel's top floors. Glass paneling and telecommunications antennas were observed being installed. The Orascom Telecom subsidiary confirmed involvement in the structure's construction, as part of the development of a GSM mobile telephony infrastructure in North Korea forup to 100,000 initial subscribers. While Orascom denies that the company's exclusive access to the North Korean telecom market is directly linked to the completion of the hotel, it is seen as an act which "builds good rapport with the people," as the company cannot engage in corporate sponsorship in North Korea.

In 2008, an official with the Committee for Cultural Relations With Foreign Countries told the Los Angeles Times that the refurbishing of the Ryugyong Hotel would be completed by 2012, coinciding with the 100th anniversary of the birth of "Eternal President" Kim Il Sung. An Orascom official indicated that the goal of the refurbishment was to facelift the structure's facade and make it more visually appealing. On December 22, 2008, photographic evidence of the restarting of construction on the hotel appeared on the Internet. The photos revealed that work had begun to enclose the upper floors in glass. In August 2009, photos appeared showing at least one side of the hotel completely clad in glass, along with the completion of the outside covering of the upper floors. Work on the building's exterior is expected to last until the end of 2010, at which point it will be safe to begin interior work, which will last until 2012 or beyond, according to Orascom chief operating officer Khaled Bichara. The completed Ryugyong will be divided among hotel accommodation, apartments and business facilities. [ edit] Architecture The Ryugyong Hotel consists of three wings, each measuring 100 metres (330 ft) long, 18 metres (59 ft) wide, and sloped at a 75-degree angle, which converge at a common point to form a pinnacle. The building is topped by a truncated cone 40 metres (130 ft) wide, consisting of eight floors that are intended to rotate, topped by a further six static floors; the structure was intended to house seven revolving restaurants. The hotel is surrounded by a number of pavilions, gardens, and terraces. The hotel was to contain 3,000 guest rooms, or 7,665 according to some sources. The building is constructed from reinforced concrete, and is covered in mirrored glass. Questions have been raised regarding the quality of the building's concrete and the alignment of its elevator shafts, which some sources say are " crooked".


93 photos

Building Activity

  • Georgi Sokolov
    Georgi Sokolov updated, added a digital reference, updated 90 media, removed a media and uploaded 5 media
    Ryugyong Hotel Ryugyong Hotel Ryugyong Hotel Ryugyong Hotel Ryugyong Hotel
    about 3 years ago via OpenBuildings.com
  • OpenBuildings
    OpenBuildings updated a media
    about 3 years ago via OpenBuildings.com