Royal Court Liverpool
The Grade II Listed Royal Court Theatre has a rich history as a significant venue for national touring theatre, opera, ballet, pop music and comedy, and has been located at the heart of Liverpool’s cultural and social life for nearly 200 years. The project began for us in late 2008 when the Royal Court Trust when we won the open architecture competition to refurbish and reinvent the building. The project is in the process of obtaining planning approval, and is a phased development due for completion in 2014. The scheme creates a strong vision for the theatre which results in a fully renovated interior space with new public areas, bars and facilities with improved access at ground floor level and vertical circulation throughout. The renovation will include the addition of a new roof top bar for theatre goers and side extension to increase back of house facilities. The ground floor extension will unify floor levels to allow direct access from the public realm. The large glazed façade to the corner of the building seeks to open up the retained brickwork as an interior space that draws in the public. This ground floor public space was inspired by the way the viewer is drawn into Edward Hopper’s Nighthawks through the distortion of perspective and the blurring of public and private within the painting. The scheme will be delivered in four fully independent phases; 1. Connect and rationalise internal public areas. The prime corner aspect of the building will be given over entirely to public foyers/bars on each level with a vertical void connecting the spaces. Seating within the auditorium will also be improved to reflect the theatre’s ongoing transformation into a world-class venue. 2. Create a new entrance foyer. The ground floor extension will provide vital foyer space. At first floor level a reveal will be cut into the existing façade to allow a first floor terrace above the extension. Advertising will be removed off the existing brick façade and displayed within two triangular elements that relate to the Liverpool Metropolitan Cathedral’s bell tower. These elements will bookend the extension. 3. Create a new rooftop venue. A new rooftop public bar will maximise the opportunity afforded by the existing building’s roof. This new public bar area will offer views across the Liverpool skyline seen through the Royal Court’s new signage. 4. Create additional Back of House areas through the creation of a side extension for office and green room space. The extension will be clad in the same material as both the proposed ground and roof top additions – corten. This material will compliment the brick façade clearly establishing existing and new elements of the theatre.

Media

17 photos and 2 drawings

Building Activity

  • Martyn Best
    Martyn Best commented
    What a charming building whose renovation will make it even more entranced in the local culture of Liverpool
    about 6 years ago via Mobile
  • Allford Hall Monaghan Morris
    Allford Hall Monaghan Morris updated and updated 21 media
    about 6 years ago via OpenBuildings.com
  • Teodora Todorova
    Teodora Todorova activity.buildings_person.delete and updated
    about 6 years ago via OpenBuildings.com
  • knoblock
    knoblock updated a media
    about 6 years ago via OpenBuildings.com
  • aprille
    aprille updated a media
    about 6 years ago via OpenBuildings.com
  • relanmasato
    relanmasato updated a media
    about 6 years ago via OpenBuildings.com
  • mbusnelli
    mbusnelli updated a media
    about 6 years ago via OpenBuildings.com
  • Danylostefan
    Danylostefan updated a media
    about 6 years ago via OpenBuildings.com
  • augustb
    augustb updated a media
    about 6 years ago via OpenBuildings.com
  • OpenBuildings
    OpenBuildings updated
    about 6 years ago via OpenBuildings.com
  • added 5 digital references
    about 6 years ago via OpenBuildings.com
  • wakey
    wakey updated a digital reference
    about 6 years ago via OpenBuildings.com
  • emma21202
    emma21202 updated a digital reference
    about 6 years ago via OpenBuildings.com