Riverside South
Riverside South is a major office development under construction in Canary Wharf, London.

The development is being planned by JP Morgan, who purchased a 999 year lease on the site from Canary Wharf Group in November 2008. It will be located on the western side of the Isle of Dogs, immediately south of Westferry Circus on the edge of the River Thames. This is one of the few sites left in the Docklands area which has been identified as suitable for the construction of skyscrapers. The original proposal consisted of two buildings of 214 metres (702 ft) and 189 metres (620 ft), designed by Sir Richard Rogers. These were approved in the summer of 2004. In April 2007, Canary Wharf Group submitted a new planning application to increase the size of the scheme by 36,420 m² to 327,255 m². The application confirmed work was underway on site. Tower 1 of the scheme was increased from 214 metres (702 ft) to 235.64 metres (773 ft), while Tower 2 was reduced from 189 metres (620 ft) to 185.84 metres (610 ft). The middle building adjoining the towers was increased from 47 metres (154 ft) to 72 metres (236 ft). The new design was granted planning permission by the London Borough of Tower Hamlets on 21 June 2007. A further minor revision was submitted for approval in October 2008, which would reduce the height of the middle building by 9m. The taller tower could become the tallest building in the UK, exceeding One Canada Square by a metre (on an AGL basis; One Canada Square is higher AOD, so will still appear taller on the skyline). This is unless Bishopsgate Tower or Shard London Bridge are built first. The combined development will have the longest river frontage of any building in London, and in terms of floorspace will be among the largest offices in Europe.

In early 2007, JPMorgan considered the development as an option for their new city headquarters, which would involve relocating from their various City of London offices. The company initially decided to remain in the City, but in August 2008 the company announced that it had signed heads of terms to move to Riverside South , and in November 2008 JP Morgan signed an agreement to purchase a 999 year lease on the site for £237 million. Canary Wharf Contractors Limited were contracted to construct the basement structure up to ground level. Work on the basement slab for Tower 1 began in July 2009, with concrete being poured for the basements. Two crane bases appeared on site in September 2009. As of April 2010, J P Morgan had not yet committed to above ground construction, but assuming they decide to proceed, it is expected that the bank will occupy the site in 2013. A number of other towers are planned or under construction in the area. These include Heron Quays West, North Quay and 22 Marsh Wall.


2 photos

Building Activity

  • updated a digital reference
    about 5 years ago via Annotator
  • updated a digital reference and removed 2 media
    about 5 years ago via OpenBuildings.com