Due to the new circumstances ,and the fact that the controlled obsolescence cycles were reaching its own terms ( fact that allows to recycle ourselves at the same tame) we are changing the actual bar to fit the new conditions.

Following the previous experiences after 8 years from the Hotel inauguration and after a deep reflection about the impermanency, we decided to design this new bar with a system much closer to stage building ,by assembling prefabricated modules which allow an easier installation (just in time), as well as its own un-installation and reconfiguration.

We were asked to do an “english” bar, this is our contemporary interpretation of it

Building Activity