Building Tilelamp at Casa do Lado

Edit profile
Building Tilelamp at Casa do Lado

The project was developed as a request of design store MiCasa. It consists of the scenographic customization of the adjacent building to the store, in order to host an art exhibition in its interior.

After the concept was defined, the construction lasted approximately four weeks. To start with, we decided where the LED tapes would be placed.

Simultaneously, we constructed a wood structure to receive the tile covering.

With the conclusion of the installation of the lighting, the structure was fixated on the walls of the house at a distance of 20 centimeters from the original construction in order to leave a space between the wall and the tiles, making the lighting more subtle and correcting any sort of irregularities that could be present in the surface of the walls.

The tiles were custom made for the project and fixated with screws.

The permanence of the installation is of approximately 6 to 10 months, for a new building will be constructed in the same ground afterwards.

Description from architects.

Media

12 photos and 1 drawing

Building Activity

  • Antonina Ilieva
    Antonina Ilieva updated
    about 10 months ago via OpenBuildings.com
  • Kiril Pavlov
    Kiril Pavlov updated a digital reference, added a digital reference, updated 13 media, uploaded 13 media and updated
    Building Tilelamp at Casa do Lado Building Tilelamp at Casa do Lado Building Tilelamp at Casa do Lado Building Tilelamp at Casa do Lado Building Tilelamp at Casa do Lado Building Tilelamp at Casa do Lado Building Tilelamp at Casa do Lado Building Tilelamp at Casa do Lado Building Tilelamp at Casa do Lado Building Tilelamp at Casa do Lado Building Tilelamp at Casa do Lado Building Tilelamp at Casa do Lado Building Tilelamp at Casa do Lado
    about 10 months ago via OpenBuildings.com